Asphalt Sealcoating in Hermantown, Minnesota
Hermantown's housing is far newer than Duluth's, Superior's or Cloquet's. NeighborhoodScout's ACS-based figures put 41.0 percent of its homes at 2000 or newer and only 8.2 percent before 1940, close to the reverse of Duluth's housing. The 2020 census counted 10,221 residents, up from 9,414 in 2010, on 34.36 square miles of land, and the Miller Hill commercial corridor along US 53 spills into the city's east side. Highway 194 and County Road 13 also cross the city, along with roads such as Maple Grove, Arrowhead and Ugstad.
Newer pavement shifts the question from rescue to routine. A driveway paved in the last ten or fifteen years mostly needs its cracks filled as they appear and a coat of sealer once the surface fades. The climate is the ridge's climate: Duluth International Airport lies immediately northeast of the city, so NOAA's normals there, about 78 freeze-thaw days and 86 inches of snow a year, describe Hermantown driveways closely. The driveway sealcoating page covers how the coat itself is applied.
free quotes, fast response, local pros.
Free quote
What lies under a Hermantown driveway
The USDA named a soil series for the city. The Hermantown series, established in St. Louis County in 2007, formed in a loamy mantle over dense Superior Lobe till on flats, low rises and footslopes of 0 to 3 percent. It is somewhat poorly drained, with seasonal saturation perched as high as 15 centimeters below the surface, and its dense layers pass water extremely slowly. On ground like that the risk is not slope but standing water: a driveway base that sits wet in spring loses strength just as the thaw arrives. Miller, Keene, Kingsbury and Merritt creeks and Rocky Run cross the city, and the Midway River begins here.
Hermantown's driveway access permit assumes a ditch and a culvert at the road. No work can start until the Public Works Director approves the application, the owner supplies a culvert of the size and type the city specifies, and a standard residential culvert is 24 feet wide. The first 15 feet of driveway off the shoulder must slope down and away from the road, falling at least 3 inches. The city maintains 73 of the 114 road miles inside its limits, plows principal collectors before neighborhood streets, and averages about six hours for a full pass.
See Hermantown, MN on Google Maps — we cover the whole area from Duluth.
Asphalt Sealcoating Services Available in Hermantown
The same seven services reach Hermantown:
See the full pricing guide for typical ranges.
Hermantown FAQs
When should a newer Hermantown driveway get its first seal coat?
Not in its first weeks. A new mat needs 30 to 60 days of cure at the least under SealMaster's guidance, and HomeGuide leans toward a year before the first coat, then one every two or three years. On Hermantown's hilltop the dependable window runs from about mid-June to early September, framed by the airport's median frost dates of May 17 and September 27, so a driveway paved in late summer is usually first sealed the following July or August.
Does widening or moving a Hermantown driveway need city approval?
Yes. The city's driveway access application says no changes or alterations to an entrance may be made without written permission, and work cannot begin until the Public Works Director approves it. The city sets the culvert's size and type, may ask for a bond or other security on top of the permit deposit, and requires the road and right-of-way to be cleaned up afterward. Resealing an existing surface does not change the entrance.
Are coal-tar sealers allowed in Hermantown?
No. Minnesota Statute 116.202 applies statewide, so coal-tar sealant products cannot be applied to asphalt or sold for that use in Hermantown any more than in Duluth, and MPCA dates the use ban to January 1, 2014. Contractors here use asphalt-based or acrylic sealers. An owner who wants to be sure can ask for the product's data sheet, and MPCA notes that coal-tar products carry a strong mothball-like odor.
Get Your Free Hermantown Quote
Free quote